Crusher Run Calculator: How Many Tons, Cubic Yards and Square Feet You Need


Ordering crusher run is easy to get wrong. Weight per cubic yard changes from source to source, and the stone packs down once you compact it, so a quick length × width × depth guess often leaves you short. Enter your size below to get cubic yards, tons and an order quantity that includes compaction. The formulas, coverage tables and project examples behind the numbers follow the tool.

Crusher Run Calculator

Estimate the cubic yards and tons of crusher run for your base, path or driveway.

Unit system

Area method

Depth and material

Density varies by stone, fines and moisture. Your supplier’s ticket is the final number.

Light and Standard reflect common 15 to 20% estimates. Heavy matches the x1.30 to x1.35 factors some road-base tools use.

Optional: cost, bags and trucks

Ask your supplier for the truck’s capacity

Estimate only. Density and compaction vary by quarry, grade and moisture; confirm with your supplier.

How to Use the Calculator and Read Your Result

To calculate your crusher run order, enter your project's total surface area, required compacted thickness, and target material density into the estimator. The tool converts these measurements into loose volume and total weight, applying a compaction adjustment so you do not run short.

How to Measure Your Area Accurately

To measure your project area, multiply its overall length by its width in feet to get the total square footage. For irregular or curved layouts, break the space into smaller rectangular sections, calculate the square footage of each block separately, and add the numbers together.

  • Rectangles: Length (ft) × Width (ft) = Square Feet
  • Triangles: [Base (ft) × Height (ft)] ÷ 2 = Square Feet
  • Circles: 3.14 × [Radius (ft)]² = Square Feet
  • Irregular shapes: Divide the site into distinct boxes, calculate each section's area, and sum them.

For example, an L-shaped driveway consisting of a 12 × 30 ft main lane and a 10 × 12 ft parking pad equals 360 sq ft plus 120 sq ft, giving a total site area of 480 sq ft.

Entering Your Compacted Depth

Enter the final depth you need after full compaction rather than the loose depth spread off the truck bed. Aggregate loses 15% to 20% of its initial height under heavy rolling, so a 4-inch compacted base requires spreading roughly 4.7 to 5 inches of loose aggregate before tamping (see the thickness section for recommended project depths).

How to Read Your Results: Cubic Yards vs. Tons

Your calculated result displays both volume (cubic yards) and total mass (tons), along with an adjusted order quantity that accounts for compaction. Quarries sell stone by weight, whereas excavation contractors measure ground displacement by volume.

  • Net Volume (cu yd): The actual spatial volume of your project footprint ($L \times W \times D \div 27$).
  • Order Quantity (cu yd): The total loose volume required before rolling. This formula accounts for aggregate settling ($Volume \div [1 - Loss\%]$).
  • Total Tonnage (tons): The final delivery weight calculated by multiplying the adjusted order volume by your selected material density (ranging from 1.21 to 1.7 tons per cubic yard).

Crusher Run Calculator Formula (with Worked Example)To calculate your required crusher run, you need to follow three simple steps: find the volume in cubic feet, convert that volume to cubic yards, and multiply by the aggregate density to get the total tonnage.

First, determine your raw volume in cubic yards by multiplying length by width by depth in feet, then dividing the result by 27. Always divide your depth in inches by 12 to convert it to feet first, as using raw inches will distort your total. The cubic feet formula is $\text{Length (ft)} \times \text{Width (ft)} \times (\text{Depth (in)} \div 12)$, and dividing those cubic feet by 27 gives your raw cubic yards. Because 1 cubic yard equals 27 cubic feet (a 3 ft × 3 ft × 3 ft block), this step gives you the exact spatial volume required before rolling or tamping.

Next, convert your volume into weight in tons by accounting for density and compaction. Crusher run density varies based on stone type and stockpile moisture, usually falling between 1.21 and 1.7 short tons per cubic yard (1.5 tons per cubic yard is standard). Since loose stone compacts and settles under heavy equipment, you must add a compaction factor to your raw volume before calculating weight. For a typical 20% volume reduction, calculate your total order volume as $\text{Raw Volume} \div 0.80$, and then multiply by your selected density factor ($\text{Weight in Tons} = \text{Order Volume} \times \text{Density}$).

For regional or metric conversions, keep these exact ratios in mind: multiply short tons by 2,000 to get pounds, or by 0.907185 to get metric tonnes. To convert cubic yards to cubic meters, multiply by 0.764555, and to convert pounds to kilograms, multiply by 0.453592.

For example, suppose you are building a 12 × 50 ft driveway with a finished 4-inch compacted base. First, calculate the surface area ($12 \times 50 = 600\text{ sq ft}$) and convert depth to feet ($4 \div 12 = 0.333\text{ ft}$). Multiplying surface area by depth gives $200\text{ cu ft}$, which divides down to $7.41\text{ cu yd}$ ($200 \div 27$). Adding a 20% compaction allowance ($7.41 \div 0.80$) brings your final order volume to $9.26\text{ cu yd}$. At a low material density of 1.21 tons per cubic yard, you will need 11.2 tons ($9.26 \times 1.21$), while at a high density of 1.70 tons per cubic yard, you will need 15.7 tons ($9.26 \times 1.70$).

Crusher Run Needed for Common Projects (Examples

Most standard home projects require between 4 and 6 inches of compacted crusher run to create a stable, non-shifting base. The required order volume increases when you account for a standard 20% compaction loss during rolling, as loose aggregate settles significantly under weight.

The table below outlines common project dimensions, estimated depths, required loose order volumes, and typical tonnage ranges across standard material densities (1.21 to 1.70 short tons per cubic yard).

Crusher Run Quantity Guide
Project Type Dimensions Compacted Depth Order Volume (cu yd) Total Weight Range (Tons)
Shed Pad10 × 12 ft4 inches1.9 cu yd2.2 – 3.1 tons
Small Driveway / Run10 × 20 ft4 inches3.1 cu yd3.7 – 5.3 tons
Parking Pad / Patio Base20 × 20 ft4 inches6.2 cu yd7.5 – 10.5 tons
Standard Long Driveway12 × 50 ft6 inches13.9 cu yd16.8 – 23.6 tons

Estimates only. Confirm quantities with your supplier.

All volume figures in this table include a 20% compaction allowance ($Volume \div 0.80$). To estimate your delivered cost, multiply your project's tonnage requirement by your local quarry's price per ton plus delivery fees.

How Many Tons Is 1 Cubic Yard of Crusher Run?

One cubic yard of crusher run weighs between 1.21 and 1.7 short tons (2,420 to 3,400 pounds), with 1.5 tons per cubic yard used as the industry standard estimate. The exact weight depends on moisture content, stone composition, and particle compaction, making your local supplier's delivery ticket the final authority for billing and hauling.

Why Crusher Run Density Varies

Crusher run density changes primarily based on regional parent rock type, moisture levels, and the ratio of coarse aggregate to fine particles.

  • Stone Type: Dense rocks like granite or basalt weigh significantly more per cubic yard than softer stone like limestone.
  • Fines Content: Stone dust fills the small empty spaces between larger angular pieces, creating a denser, heavier mass than screened, uniform gravel.
  • Moisture Content: Water held within open-air quarry stockpiles adds considerable temporary weight to every yard delivered.

Why Online Calculators Show Different Figures

Online aggregate tools report varying weight conversion rates—typically 1.21, 1.5, or 1.7 tons per cubic yard—because they source figures from different regional suppliers and aggregate specs.

Crusher Run Density Presets
Source / Density Preset Short Tons per cu yd Pounds per cu yd Common Quarry Application
Low Density1.21 t/yd³2,420 lbsDry, open-graded 2" minus or 3/4" loose stone
Typical / Standard1.50 t/yd³3,000 lbsStandard damp crushed base (e.g., CA-6 / CR-6)
High Density1.70 t/yd³3,400 lbsHighly compacted or wet dense-grade road base

Density varies by stone, fines and moisture. Your supplier's ticket is the final number.

Because quarries weigh trucks on calibrated scales rather than measuring loose bucket volume, purchasing stone by the ton ensures you pay for exact mass regardless of density variations.

How Much Does 3 Yards of Crusher Run Weigh?

Three cubic yards of loose crusher run weigh approximately 3.63 to 5.10 short tons (7,260 to 10,200 pounds). At the industry standard density of 1.5 tons per cubic yard, 3 cubic yards total 4.5 tons, which comfortably fits within the load capacity of a standard tandem-axle dump truck

How Many Square Feet Does 1 Ton of Crusher Run Cover?

One ton of crusher run covers roughly 48 to 67 square feet at a standard 4-inch loose depth, or 108 to 134 square feet at a 2-inch depth. The exact surface coverage depends directly on the material's density, as heavier, moisture-dense stone yields slightly less loose volume per ton than dry, lighter rock.

Crusher Run Coverage Area by Depth and Density

The table below shows loose surface coverage in square feet per ton of crusher run across common layer depths and material densities before compaction.

Crusher Run Coverage per Ton by Depth
Depth (Inches) Low Density (1.21 t/yd³) Typical Density (1.50 t/yd³) High Density (1.70 t/yd³)
2"134 sq ft108 sq ft95 sq ft
3"89 sq ft72 sq ft64 sq ft
4"67 sq ft54 sq ft48 sq ft
6"45 sq ft36 sq ft32 sq ft
8"33 sq ft27 sq ft24 sq ft

Approximate area covered by one ton at each compacted depth. Confirm with your supplier.

To calculate loose square feet per ton for any depth, divide $27 \times 12$ by your depth in inches, then divide by the aggregate density factor in tons per cubic yard ($\text{Coverage} = [324 \div \text{Depth}] \div \text{Density}$). Keep in mind that compacting the base reduces these uncompacted surface coverage figures by roughly 15% to 20%.

How Much Is 1 Cubic Yard of Crusher Run?

One cubic yard of crusher run typically costs between $36 and $51 for the material alone when using an illustrative base rate of $30 per short ton. Because aggregate suppliers weigh trucks on calibrated scales rather than measuring loose bucket volume, your total cost per yard depends on aggregate density and local truck delivery fees.

To calculate your exact aggregate cost, multiply your quarry's delivered price per ton by the material's density factor, then add truck freight: $\text{Price per Cubic Yard} = (\text{Price per Ton} \times \text{Tons per Cubic Yard}) + \text{Delivery Fees}$. Using an example material price of $30 per short ton (excluding delivery fees), a low-density material ($1.21\text{ t/yd}^3$) costs $36.30 per cubic yard ($30 \times 1.21$). A standard-density base ($1.50\text{ t/yd}^3$) costs $45.00 per cubic yard ($30 \times 1.50$), and a high-density compacted mix ($1.70\text{ t/yd}^3$) comes to $51.00 per cubic yard ($30 \times 1.70$).

When ordering stone, contact nearby suppliers or aggregate yards to request a delivered price per ton that accounts for site distance and haulage. Entering that per-ton price into the estimator tool calculates your total order expense across both volume and weight.

Why Do Calculators Give Different Compaction Numbers?

Online calculators show varying compaction figures—typically between 15% and 35%—because different projects use distinct stone sizes, compactor weights, and ground conditions. Higher moisture, smaller stone with stone dust fines, and mechanical plate rollers force stone particles closer together, increasing total volume loss.

Where the 15%, 20%, and 30–35% Gaps Come From

These compaction percentages reflect different real-world installation conditions, aggregate mixes, and waste allowances:

  • 15% Compaction Loss: Typical for light home projects like walkways or small shed pads using hand tampers or light plate compactors over firm ground.
  • 20% Compaction Loss: The standard contractor benchmark for residential driveways and parking pads using heavy vibrating plate compactors or small rollers.
  • 30% to 35% Compaction Loss: Used for heavy commercial road bases subjected to heavy equipment rollers, including a 5% to 10% allowance for stone sinking into soft ground and site waste.

The Correct Compaction Formula

To avoid running short on material, do not simply add 15% or 20% to your raw volume. Compaction applies to the total loose volume off the delivery truck, so use this exact formula:

To calculate your total order volume, divide your required compacted volume by 0.80 (for a standard 20% compaction loss):

To calculate your total order volume, divide your required compacted volume by 0.80 (for a standard 20% compaction loss):

$$\text{Order Volume} = \frac{\text{Compacted Volume}}{1 - \text{Loss \%}}$$

Quick Example:

  • Compacted Volume Needed: 10 cubic yards
  • Compaction Loss: 20% ($1 - 0.20 = 0.80$)
  • Calculation: $10 \div 0.80 = \mathbf{12.5 \text{ cu yd to order}}$

Quick Example:

  • Compacted Volume Needed: 10 cubic yards
  • Compaction Loss: 20% ($1 - 0.20 = 0.80$)
  • Calculation: $10 \div 0.80 = \mathbf{12.5 \text{ cu yd to order}}$

Quick Example (20% Loss):

If you need 10 cu yd compacted, divide 10 by 0.80 ($1 - 0.20$):

  • $10 \div 0.80 = \mathbf{12.5 \text{ cu yd to order}}$

For example, if your project needs 10 cubic yards of finished, compacted stone at a 20% loss factor, calculate your order as $10 \div (1 - 0.20)$, which equals $10 \div 0.80 = 12.5\text{ cubic yards}$. Adding a basic 20% ($10 \times 1.20$) gives only 12.0 cubic yards, leaving you short on site.

Choosing the Right Compaction Factor for Your Project

Select a compaction factor based on your equipment and ground conditions:

  • Select 15%: For light-duty walkways, patio bases, or small shed pads compacted with a hand tamper on hard soil.
  • Select 20%: For residential driveways and parking pads using a vibratory plate compactor (this is the safest default choice).
  • Select 25% to 30%: For heavy truck driveways, soft or muddy soil where stone sinks into the earth, or uneven ground requiring extra leveling.

How Thick Should Crusher Run Be?

Residential driveways and patio bases require between 4 and 6 inches of compacted crusher run to maintain structural stability, while heavy commercial vehicle paths require up to 8 inches. Installing aggregate in thin 2- to 4-inch lifts and compacting each layer individually prevents settling and rutting under heavy loads.

Recommended Compacted Depths by Project Type

The table below outlines standard compacted depth guidelines for common residential and commercial aggregate projects.

Project ApplicationCompacted DepthInstallation Recommendation
Residential Driveway4 to 6 inches4 inches suits light vehicle traffic; 6 inches supports heavy trucks or frequent usage.
Heavy / Commercial DrivewayUp to 8 inchesInstall in multiple lifts to handle heavy equipment, RVs, or fleet traffic.
Slab, Paver, or Patio Base4 to 6 inchesCreates a rigid, non-shifting foundation under concrete slabs, pavers, and stone patios.

Crusher Run as a Base Layer vs. a Finished Surface

Crusher run functions exceptionally well as both an underlayment base and a stand-alone driveway surface, though each application requires slightly different maintenance and layering strategies.

  • As a Sub-Base Layer: When used under pavers, asphalt, or concrete, a 4- to 6-inch compacted crusher run base provides superior load distribution and frost-heave protection. The stone dust and fine aggregate fill all air voids, forming a dense, pavement-like foundation that prevents upper layers from sinking or cracking over time.
  • As a Finished Driveway Surface: A full crusher run driveway packs down into a tight, durable driving surface that resists washouts far better than loose rounded gravel. However, exposed fine particles can turn dusty in dry weather or track tracking dust into homes when wet. To eliminate tracking while maintaining structural strength, contractors frequently lay a 4-inch compacted crusher run base and top it with a 2-inch surface layer of clean, washed #57 stone [VERIFY].

Crusher Run Grades and Names

Crusher run is sold under several regional grade specifications, which define the maximum size of the coarse stone mixed with fine aggregate. Understanding these sizes ensures you select the correct material for your project's load and drainage requirements.

Standard Crusher Run Grades and Uses

The table below details common commercial stone sizes, industry spec codes, and their primary landscaping and construction applications.

Grade / NameMaximum Stone SizeTypical Application
2" Minus2 inches down to dustHeavy sub-base layer for deep driveways, soft subgrades, and heavy equipment access roads.
1.5" Minus1.5 inches down to dustSub-base stabilization for deep driveway foundations and shed bases over soft soil.
3/4" Minus3/4 inch down to dustStandard residential driveway surface layer, walkway base, and paver patio underlayment.
CR-6 / CA-6Approx. 3/4 inch down to dustMid-Atlantic and Southeast DOT-referenced dense-graded aggregate spec for road base and driveways.

Regional Names for Crusher Run

Different geographic regions and quarries use distinct terminology for the same coarse-stone-and-fines mixture. Common trade names include:

  • Crush and Run: A widespread informal term used across the Southern and Eastern United States.
  • Quarry Process (QP): Commonly used in the Northeast US to denote unscreened crushed stone with stone dust.
  • Dense Grade Aggregate (DGA): The technical engineering term used in highway construction and state DOT specifications.
  • Road Base / Road Crush: General industry terms used by suppliers and excavation contractors across western regions.

All of these terms refer to unscreened, angular aggregate that locks together tightly when rolled or tamped.

When Crusher Run Is the Wrong Choice

Do not use crusher run in areas requiring open water drainage, such as behind retaining walls, inside French drains, or around basement footings. The fine stone dust and small aggregate particles fill all internal air gaps, causing the material to pack into a dense, semi-impermeable layer that traps water rather than allowing it to pass through.

For drainage applications, use washed, uniform stone like #57 crushed granite or river gravel instead.

How Many Truck Loads Will You Need?

A standard tandem-axle dump truck carries about 14 to 18 tons of crusher run per trip, while a semi-end dump trailer hauls 20 to 25 tons [VERIFY]. Small single-axle dump trucks generally transport around 10 to 14 tons per shipment [VERIFY].

Standard Truck Payload Capacities

The payload capacity of a delivery truck depends on the vehicle axle setup, local weight limits, and stone moisture content.

Typical dump truck capacities for crusher run delivery
Truck Type Typical Capacity (Tons) Typical Capacity (Cubic Yards) Best Used For
Single-Axle Dump Truck 10 to 14 tons 7 to 9 cu yd Small shed pads, walkways, and minor repairs
Tandem-Axle Dump Truck 14 to 18 tons 9 to 12 cu yd Standard residential driveways and patio bases
Semi-End Dump Trailer 20 to 25 tons 13 to 17 cu yd Large commercial pads and long private roadways

Capacities are typical and vary by truck and supplier. Cubic yard figures assume about 1.5 tons per cubic yard.

Rounding Up Your Order for Delivery

Always round your calculated material order up to the nearest full or half truckload to avoid short-load haulage surcharges or delivery delays.

  • Check minimum load fees: Quarries and trucking companies charge flat freight fees per trip regardless of whether the truck bed is half empty or full.
  • Consolidate deliveries: If your project requires 16 tons and a local tandem truck carries 14 tons, ordering 18 tons completes the job in a single trip while providing extra stone for soft spots or unexpected washouts.